Gullfaks A Drilling FEED Study

  • Client: Statoil
  • Contract partner: MMO, Bergen
  • Working model: Split location
  • Location: Norwegian CS
  • Installation type: PDQ platform
  • Study schedule: 2009 - 2010
  • Study scope: Refurbishment of the drilling areas in order to
    • Have an economic lifetime at least until 2030
    • Improve HSE/Working Environment
    • Maximize the Net Present Value (NPV)
    • Improve operational efficiency
    • Meet Norsok II standard
  • Deliverables according to TR1244:
    • System drawings
    • Arrangement drawings
    • HSE assessments
    • Risk assessment/register
    • Master Equipment List
    • Installation assessments
    • Weight estimate
    • Cost and schedule estimates
    • 3D Model
    • Study report
 
Photo: Øyvind Hagen/Equinor