Statfjord Late Life

  • Client: Statoil
  • Contract partner: MMO
  • Working model: Split location
  • Installation type: PDQ platform
  • Location: Norwegian CS
  • Study schedule: Q2 2004 – Q1 2005
  • Study scope: FEED study for upgrade of the drilling facilities for Statfjord B & C including
    • Conversion from DC to AC
    • Pipe handling system/BOP handling
    • MPA/mud system (MPA module, mud systems and slurry injection/HP test unit)
  • Deliverables according to TR1244 Class D:
    • System drawings
    • Arrangement drawings
    • HSE/operational assessments/reviews
    • Risk assessments
    • Installation assessments
    • Schedule
    • MEL/MTO
    • Weight/cost estimate
    • 3D model
    • Study report
   